NEWS

1 min

T3M ensures the continuity of your transport operations on the italian corridor during the maurienne line closure


From 11 September to 8 October 2026, scheduled works on the Maurienne railway line will result in a temporary interruption of rail traffic on this corridor.

To ensure the continuity of freight transport between France and Italy, T3M has implemented an adapted operating plan throughout the duration of the works.


An alternative route via Switzerland


Trains to and from Italy will be rerouted via Switzerland, allowing rail services to be maintained throughout this period :

  • Reduction from 4 to 3 weekly round trips during the works period ;
  • The first departure via Switzerland from Valenton is scheduled for 12 September ;
  • Regular services via Modane will resume from 9 October.

Thanks to this temporary reorganisation, T3M continues to support its customers.


Updated train schedules


The updated operating schedules for this period are available below :



Teams fully mobilised


Our teams remain fully committed to ensuring the transport of your goods under the best possible conditions throughout this period.

For any questions, our Customer Service team remains at your disposal :

📧 booking@t3m.fr
☎️ +33 (0)4 67 27 18 50

Our latest news

Discover the highlights of our group.

Temps de lecture : 1 min

T3M Strengthens Its Rail Freight Service Between Valenton and Novara

The Open Modal Group is strengthening the rail freight offering of its combined transport operator, T3M, on the route between Valenton (France) and Novara (Italy) by increasing its service to four weekly round trips.
Temps de lecture : 1 min

Open modal at SITL 2026! 

From March 31 to April 2 
Temps de lecture : 1 min

Mediterranean corridor : more capacity & more flexibility 

Opening of new routes: Lille Miramas and Bonneuil Miramas